Sunday, June 21, 2009

Side Rail Repair

A jig was built out of plywood to aid in the repair process. It would hold the side rail upright, straight, and would allow us to clamp the rail and keep it from tipping over after epoxy.



Once the rail had been epoxied and allowed to dry, the remaining void was then in filled with a historic pointing mortar to eliminate the crack and to keep moisture out.


No comments: